House construction today is largely project-based, where the buildings are tailored tounique conditions and locations that are rarely the same as another build on anotherbuilding site. In addition to the building itself and the building site, involved actorsusually also change from project to project. As a result of today's project-basedconstruction, there is a lack of a standardized and systematic work process forconstruction work. A systematic work process could contribute to all the players' pursuitof profit. To explore the possibilities of creating an improved work process, this study focusedon balconies of wooden houses. The purpose and objectives of the work were therefore designed to evaluate today'sconstruction work for the design of balconies in wooden houses, where possible areasof improvement were evaluated to create a systematic work process for constructorsin designing and dimensioning balconies in wooden houses.In order to achieve the purpose and objectives of the work, four questions have beendeveloped that focus on the production of systematic work processes, the current workprocess of the construction work, design methods and balconies in wooden houses.Existing research and published material were found through a literature and contextstudy to further develop the study’s work. Theory regarding systematisation and process development, balconies,dimensioning of supporting structures, etc. was the basis for how the work would becarried out. The systematized work process for balcony design was, however, createdusing information from the qualitative interview study with a total of eight (8)respondents in different roles I house building. The work process was then partiallytested in a quantitative verification. The work resulted in a systematic work process in the form of a checklist that includesgeneral tips as well as a chronological workflow that describes how, when, with whomand what should and can be done at the balcony design to get the best possible results.A description of the existing balcony types has also been developed to simplify workand to clarify important points and tasks in the design of a particular type of balcony. The workflow is divided into the activities of the design and dimensioning, such asstart-up, design and dimensioning of the balcony's main components, detail designand dimensioning of fastening components, drawing up drawings and assemblydescriptions, and follow-up and development of the work process. Based on the results of the study, the questions were answered with a description ofthe four (4) types of balcony, which were based on theory and were strengthened bymeans of empirical data from the respondents. Two (2) of the balcony types are viiiconsidered more common, balconies with pillars to land and rods above the balconyplate, where the latter is considered the most common in wooden houses at present.Today's construction work for designing and dimensioning balconies in woodenhouses is similar in large part, but due to the use of prefabrication and standardizationdegree the work differs from each other. The verification of a part of the work process resulted in a balcony solution with crosslaminated timber as a balcony slab and in a comparison between results from aproposed software and hand calculations. The comparison showed that the softwarecan be used for dimensioning balconies with cross laminated timber, with the exceptionthat the dimensioning for fire must be done by hand because of deficiencies in thesoftware's settings. The study has shown that systematisation is often based on LEAN Production, whichwas created by the Japanese automotive industry, which focuses on creating efficientwork processes by circularly examining, testing, evaluating and developing workprocesses. The conclusion of the work is that it is possible to systematise construction work, butunlike the manufacturing industry, the work process must have adjustment possibilitiesduring the work to meet the commonly occurring changes in house construction.However, in order for the systematisation work to be carried out, increasedunderstanding and involvement from and by other actors than constructors arerequired. A systematic work process together with type solutions and standardized calculationmethods can shorten the design time, improve and secure the solutions, and allowmore time for creative thinking to further improve the balcony solutions and the workprocess.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:ltu-73287 |
Date | January 2019 |
Creators | Ersson, Tina |
Publisher | Luleå tekniska universitet, Institutionen för samhällsbyggnad och naturresurser |
Source Sets | DiVA Archive at Upsalla University |
Language | Swedish |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.002 seconds