Return to search

Comparing dynamic risk-based scheduling methods with MRP via simulation /

Thesis (M.S.)--University of Louisville, 2008. / Department of Industrial Engineering. Vita. "December 2008." Includes bibliographical references (leaves 82-85).

Identiferoai:union.ndltd.org:OCLC/oai:xtcat.oclc.org:OCLCNo/610059029
Date January 2008
CreatorsSun, Li.
Source SetsOCLC
LanguageEnglish
Detected LanguageEnglish

Page generated in 0.0021 seconds