Purpose - A research gap was identified in relation to the production related factors during ramp-up. Therefore, the purpose of the study was to “simplify production ramp-up by defining how measures could be prioritised in high technology company.” Method – The study used a single-case study method with a qualitative and explorative approach. This method was used to gain in-depth knowledge of the case. The study was conducted at Saab, a high technology company within the aerospace industry. Findings – The findings included a list of critical factors for ramp-up control and two additional critical factors that are relevant to high technology companies, along with five additional measures. From the case the main critical factors were related to personnel, education and experience. Implications – The study has contributed with a simplified ramp-up control method with implications for high technology industries. The new method will contribute to a more effective time to volume phase relevant for both practitioners and researchers. Limitations - As the study uses a new ramp-up control method it has only been applied to one case. The complete data from the case cannot be showcased due to secrecy.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:hj-44147 |
Date | January 2019 |
Creators | Svensson, Philip, Blom, Johannes |
Publisher | Tekniska Högskolan, Högskolan i Jönköping, JTH, Logistik och verksamhetsledning, Tekniska Högskolan, Högskolan i Jönköping, JTH, Logistik och verksamhetsledning |
Source Sets | DiVA Archive at Upsalla University |
Language | English |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0024 seconds