ITC/USA 2011 Conference Proceedings / The Forty-Seventh Annual International Telemetering Conference and Technical Exhibition / October 24-27, 2011 / Bally's Las Vegas, Las Vegas, Nevada / Satellite and launch vehicles continues to suffer from catastrophic infant mortality failures. NASA now requires satellite suppliers to provide on-orbit satellite delivery and a free satellite and launch vehicle in the event of a catastrophic infant mortality failure. A high infant mortality failure rate demonstrates that the factory acceptance test program alone is inadequate for producing 100% reliability space vehicle equipment. This inadequacy is caused from personnel only measuring equipment performance during ATP and performance is unrelated to reliability. Prognostic technology uses pro-active diagnostics, active reasoning and proprietary algorithms that illustrate deterministic data for prognosticians to identify piece-parts, components and assemblies that will fail within the first year of use allowing this equipment to be repaired or replaced while still on the ground. Prognostic technology prevents equipment failures and so is pro-active. Adding prognostic technology will identify all unreliable equipment prior to shipment to the launch pad producing 100% reliable equipment and will eliminate launch failures, launch pad delays, on-orbit infant mortalities, surprise in-orbit failures. Moving to the 100% reliable equipment extends on-orbit equipment usable life.
Identifer | oai:union.ndltd.org:arizona.edu/oai:arizona.openrepository.com:10150/595730 |
Date | 10 1900 |
Creators | Losik, Len |
Contributors | Failure Analysis |
Publisher | International Foundation for Telemetering |
Source Sets | University of Arizona |
Language | en_US |
Detected Language | English |
Type | text, Proceedings |
Rights | Copyright © held by the author; distribution rights International Foundation for Telemetering |
Relation | http://www.telemetry.org/ |
Page generated in 0.002 seconds