Return to search

Metodologia para o rateio do bloco hidráulico no planejamento hidrotérmico de médio prazo

Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-09-22T13:28:04Z
No. of bitstreams: 1
marcusaugustusalvesferreira.pdf: 1083212 bytes, checksum: e0eca7cabdbe43d54d54c8e20f191594 (MD5) / Approved for entry into archive by Diamantino Mayra (mayra.diamantino@ufjf.edu.br) on 2016-09-26T20:28:52Z (GMT) No. of bitstreams: 1
marcusaugustusalvesferreira.pdf: 1083212 bytes, checksum: e0eca7cabdbe43d54d54c8e20f191594 (MD5) / Made available in DSpace on 2016-09-26T20:28:52Z (GMT). No. of bitstreams: 1
marcusaugustusalvesferreira.pdf: 1083212 bytes, checksum: e0eca7cabdbe43d54d54c8e20f191594 (MD5)
Previous issue date: 2010-08-27 / A eficiência na operação de sistemas predominante hidrotérmicos, como o Sistema
Interligado Nacional brasileiro (SIN), é estreitamente relacionada à execução de um
planejamento da operação consistente. Os modelos de decisão estratégica usados em
estudos de médio prazo são capazes de determinar a política operativa que minimiza os
custos de operação e o risco de déficit usando uma modelagem a sistemas equivalentes
de energia. Este trabalho trata de uma proposta para ser acoplada, pela função de custo
futuro esperado da operação, a um modelo de decisão estratégica, de modo a permitir a
desagregação dos subsistemas nos seus reservatórios individuais, para cada mês e
seqüência hidrológica. Assim, a proposta é desenvolver um modelo que seja capaz de
verificar se as metas globais da geração dos subsistemas, fornecidas pelos os modelos
de decisão estratégica, são alcançáveis. Para tanto, a ferramenta desagrega a solução
encontrada para os sistemas de equivalentes de energia na operação a usinas
individualizadas. A metodologia possui dois módulos: no primeiro é realizado o
despacho dos sistemas equivalentes de energia uma rotina iterativa de programação
linear e achadas as metas globais de geração para cada um deles, considerando as
funções de custo futuro esperado da operação e o intercâmbio da energia entre
subsistemas. O segundo módulo é um otimizador não-linear do despacho mensal das
usinas hidrelétricas de cada subsistema isoladamente, que tenta alcançar as metas de
geração do módulo anterior, maximizando o volume armazenado dos reservatórios. A
inovação deste modelo está no módulo de simulação a usinas individualizadas, que não
é baseado em regras heurísticas, mas em uma rotina de programação não-linear (PNL).
O uso de técnicas de otimização diminui a interferência do usuário no processo de
simulação, uma vez que seu conhecimento é baseado na experiência adquirida ao longo
do histórico da operação. Além disso, a proposta dispensa a adaptações quando novas
políticas operativas forem adotadas. Assim, este modelo, quando estiver completo e
validado, poderá despontar como uma alternativa ao modelo de simulação oficial
utilizado pelo Setor Elétrico Brasileiro (SEB), cujo módulo de simulação a usinas
individualizadas é baseado em uma política de operação paralela dos reservatórios. / The efficiency in the operation of predominantly hydrothermal systems, as the Brazilian
Interconnected System (SIN), is closely related to the execution of a consistent
operation planning. The strategical decision models used in long term studies are
capable to determine the operative politics that minimizes the operation costs and the
risks of deficit by using an energy equivalent reservoirs modeling. This work deals with
a proposal that may be coupled to a strategical decision model by the expected cost to
go function, in order to allow the disaggregation of the subsystems’ into its the
individual reservoirs, for every month and for each streamflow sequence. So, the
proposal is the development of a model where it is possible to verify if the subsystems’
generation global goals, supplied for the strategical decision models, are reachable. To
work in such way, the tool disaggregates the solution found for the energy equivalent
systems to the individualized plants. The methodology has two modules: in the first one
the optimal dispatch of the energy equivalent subsystems is done with an iterative linear
programming routine and the global generation goals for each one of the subsystems are
found, considering the energy interchange between them. The second module, is an
individualized plants nonlinear optimizer modeled for dispatching the hydroelectric
plants of each subsystem separately, in order to try to reach the generation goals defined
by the previous module and to maximize the reservoirs’ levels. The innovation of this
model is the individualized plants simulation module, which is not based on heuristic
rules, but in a nonlinear programming routine (NLP). The use of optimization
techniques diminish the interference of the user in the simulation process, since his
knowledge is usually based on the experience acquired throughout the operation history.
Moreover, the methodology dismisses the adaptation of the model whenever new
operative politics are adopted. Thus, this model, after the validation process, may dawn
as an alternative to the simulation model that is officially used by the Brazilian
Electrical Sector (SEB), whose individualized plants simulation module is based on the
politics of the parallel operation of the reservoirs.

Identiferoai:union.ndltd.org:IBICT/oai:hermes.cpd.ufjf.br:ufjf/2558
Date27 August 2010
CreatorsFerreira, Marcus Augustus Alves
ContributorsMarcato, André Luis Marques, Oliveira, Edimar José de, Belati, Edmarcio Antonio, Silva Junior, Ivo Chaves da, Oliveira, Leonardo Willer de
PublisherUniversidade Federal de Juiz de Fora (UFJF), Programa de Pós-graduação em Engenharia Elétrica, UFJF, Brasil, Faculdade de Engenharia
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Sourcereponame:Repositório Institucional da UFJF, instname:Universidade Federal de Juiz de Fora, instacron:UFJF
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.016 seconds