This research is addressing the causes and effects of project delays in the coal mining industry in South Africa. A literature review was conducted and it was found that the causes of delays are extensively researched in the construction industry with only limited reference to delays in the mining industry which are mainly risk based. The effects of delays are predominantly listed as timing and cost effects.
Identifer | oai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:unisa/oai:uir.unisa.ac.za:10500/6134 |
Date | 20 August 2012 |
Creators | Lee, Clinton |
Source Sets | South African National ETD Portal |
Detected Language | English |
Type | Thesis |
Relation | 2011 MBL 3 Research Report; |
Page generated in 0.0015 seconds