Eskom is experiencing problems in the field of protection maintenance and in-service breakdowns which negatively influence the quality of electrical supply to the consumer, an integral component of the utility business. These facts initiated the research into the further development of a generic relay to be implemented as a strategic spare for the replacement of several schemes operating within Eskom’s southern region. These include the electromechanical, solid state and numerical distance protection relay and scheme failures on the 132 / 66 kV feeder network. Hence, the primary objective of the research is to develop, test and configure the strategic spare in terms of software and peripheral hardware for the input and output terminal connections, generic equations and settings for the purpose of the scheme replacements. The various schemes are assessed for stepped distance and permissive intertripping for three or single pole operation. This is done in conjunction with the internal and external circuit diagrams in order to understand the detailed operation of the scheme and to ensure the effective implementation of the strategic spare. The generic relay is configured for the emergency replacement of the various schemes during in-service breakdowns. This constitutes a temporary installation and therefore the downtime in essence, of all the distance protection schemes that require replacement, is limited to a minimum. This dissertation therefore explores the implementation of the strategic spare.
Identifer | oai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:nmmu/vital:10808 |
Date | January 2000 |
Creators | Harris, Raymond Trevor |
Publisher | Port Elizabeth Technikon, Faculty of Electrical and Mechanical Engineering |
Source Sets | South African National ETD Portal |
Language | English |
Detected Language | English |
Type | Thesis, Masters, MTech |
Format | xxxii, [273] pages, pdf |
Rights | Nelson Mandela Metropolitan University |
Page generated in 0.0018 seconds