Retscreen Decision Support System For Prefeasibility Analysis Of Small Hydropower Projects

Renewable energy sources are getting much more important to reduce the increasing threat coming from greenhouse gases. Hydropower is the most important source of renewable energy. However, development of a hydropower project is a challenging engineering process. Several computer programs have been developed to make initial estimations on hydropower schemes. A computer program named RETScreen Small Hydro Project Model has been developed with the objective to make complete pre-feasibility studies including costing and financial analysis. Two case studies, which have been under construction in Turkey, will be used to check the accuracy of software in Turkish practice. Then in light of the results, RETScreen software will be used to make a pre-feasibility report on an existing multipurpose dam in Turkey. Electricity can be generated at existing dams which requires minor civil works. Porsuk Dam which is a 36 year old dam used for domestic, industrial and irrigation water supply will be evaluated for energy generation by constructing a penstock, powerhouse and installing electromechanical equipment.

Identiferoai:union.ndltd.org:METU/oai:etd.lib.metu.edu.tr:http://etd.lib.metu.edu.tr/upload/12609339/index.pdf
Date01 February 2008
CreatorsKucukbeycan, Mehmet
ContributorsAltinbilek, Dogan H.
PublisherMETU
Source SetsMiddle East Technical Univ.
LanguageEnglish
Detected LanguageEnglish
TypeM.S. Thesis
Formattext/pdf
RightsTo liberate the content for public access