ITC/USA 2010 Conference Proceedings / The Forty-Sixth Annual International Telemetering Conference and Technical Exhibition / October 25-28, 2010 / Town and Country Resort & Convention Center, San Diego, California / Design, development, fabrication, and deployment of an austere, deployable telemetry (TM) system, in only 3 1/2 weeks, will be discussed. This austere approach will be compared to a standard approach. TM candidate systems will be discussed along with exigencies and limitations (test geometry, link analysis, multiple test areas, schedule, cost, fabrication ...) that shaped their selection. Utilization of existing Radio Frequency (RF) systems in "unintended" applications will be discussed. System setup and BER testing with a simulated 'aircraft' will be presented, including observed multipath effects during testing, versus actual performance. Finally, benefits and test efficiencies garnered by having vehicle TM, real- time TM acquisition, processing and display, while deployed to a test area with no range instrumentation, will be presented.
Identifer | oai:union.ndltd.org:arizona.edu/oai:arizona.openrepository.com:10150/605958 |
Date | 10 1900 |
Creators | Pozmantier, Ronald |
Contributors | Edwards Air Force Base |
Publisher | International Foundation for Telemetering |
Source Sets | University of Arizona |
Language | en_US |
Detected Language | English |
Type | text, Proceedings |
Rights | Copyright © held by the author; distribution rights International Foundation for Telemetering |
Relation | http://www.telemetry.org/ |
Page generated in 0.0021 seconds