Estudo teórico da eficiência de uma usina termelétrica baseado em dados reais

Submitted by Nara Lays Domingues Viana Oliveira (naradv) on 2015-06-12T22:36:19Z
No. of bitstreams: 1
000006AB.pdf: 9859828 bytes, checksum: 7298da927fa0f798beed1d1cb69fcb2a (MD5) / Made available in DSpace on 2015-06-12T22:36:19Z (GMT). No. of bitstreams: 1
000006AB.pdf: 9859828 bytes, checksum: 7298da927fa0f798beed1d1cb69fcb2a (MD5)
Previous issue date: 2012 / CNPQ – Conselho Nacional de Desenvolvimento Científico e Tecnológico / Neste trabalho, foi realizada a simulação do ciclo térmico da Usina Termoelétrica São Jerônimo – UTSJ. A Usina, muito antiga, possui caldeira do tipo grelha. Na mesma Usina foi instalada uma caldeira experimental de leito fluidizado, para funcionar em paralelo com a existente. O trabalho é iniciado com a modelagem de um ciclo de Rankine simples e segue evoluindo até se estabelecer a configuração mais adequada e representativa na tarefa de simular o modo de trabalho da Usina Termelétrica São Jerônimo – UTSJ. Desta forma, foram adotadas as considerações mais convencionais na prática de projeto de centrais termelétricas cujos sistemas térmicos baseiam-se no ciclo de Rankine. As simulações, que se caracterizam pela resolução simultânea das equações que modelam o ciclo e seus componentes, foram efetuadas através de programa IPSE-pro®. As simulações foram aplicadas para a obtenção dos resultados mais importantes na análise de sistemas térmicos, tais como rendimento térmico do ciclo, potência, vazões mássicas do sistema, calor trocado no gerador de vapor e no condensador, entre outros. Por fim, com objetivo de melhorar o rendimento térmico da planta, são apresentadas algumas alternativas ao sistema atual, tais como o aumento de eficiência da caldeira mediante substituição ou a adição de uma caldeira em paralelo à original. / In this work was made the simulation of the thermal cycle of São Jerônimo - UTSJ thermal power plant. The power plant, very old, has a grate boiler. In the same power plant was installed an experimental fluidized bed boiler, workingin parallel with the existing one. The work starts with the modeling of a simple Rankine cycle and evolves up to establish the most suitable and representative configuration to simulate the mode the work of São Jerônimo –UTSJ thermal power plant. Therefore, in this work it was adopted the more conventional considerations in the design practice for thermal power plants whose systems are based on the Rankine cycle. The simulations, which are characterized by the simultaneous solving of equations that model the cycle and its components, were made through the IPSE-pro® software. The simulations were applied to obtain the main results on the analysis of thermal systems such as, thermal efficiency of the cycle, power, system mass flow, heat exchanged in the steam generator and condenser, among others. Finally, in order to improve the thermal efficiency of the plant, some alternatives to the actual system were presented.

Identiferoai:union.ndltd.org:IBICT/oai:www.repositorio.jesuita.org.br:UNISINOS/3843
Date January 2012
CreatorsCosta, Herson Vargas da
Contributorshttp://lattes.cnpq.br/6080899044475510, Wander, Paulo Roberto, Indrusiak, Maria Luiza Sperb
PublisherUniversidade do Vale do Rio dos Sinos, Programa de Pós-Graduação em Engenharia Mecânica, Unisinos, Brasil, Escola Politécnica
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/doctoralThesis