Return to search

Grid Optimization Of Wind-Solar Hybrid Power Plants : Case Study Of Internal Grid Connections

Hybrid renewable energy systems (HRES) have proven to be a more stable and feasible source of energy than heir single source counterparts. The benefit of HRES is their ability to balance the stochastic behavior of wind and solar production. As result of this, they have been used as stand-alone systems with great success. Optimization studies in the field have shown optimum sizing of the components in the system to be a key element in order to increase feasibility. This paper focuses on the HRES impact on internal grid design and cost. The goal of the thesis is to create a mathematical function and graph on the internal grid design/cost relation for a virtual site with varying wind speed and solar irradiation. A secondary goal is to analyze how much Photovoltaics (PV) in Megawatt (MW) that can be connected to the internal grid post realization of the wind farm and to performed this analyze on the two specific case projects, Site A (17.25 MW) in Sweden and Site B (51.75 MW) in Italy. By utilizing a case study methodology, a mathematical model was created based on two case projects, both with potential to be a combined Wind-PV hybrid plants provided by the wind developer OX2. Identifiers for the two cases studied in this thesis where removed with respect to OX2’s ongoing projects. Hybrid renewable energy systems is a method of increasing the utilization of a regions RES, the system has an increase in overall power output compared to the single RES alternative. However, the internal grid cost was shown to be 3.85 % more expensive Site A and 5.3 % in Site B. This stood in direct correlation to the HRES in Site A using 8.6 % more cable for its internal grid and 29.7 % more in Site B, this is highly depending (depending on the location of the PV array). Furthermore, the case projects showed that the maximum PV to be connected post realization of the farm without major curtailment would be 11.5% of the wind farms rated power in the case of site A and 67.6 % in the case of Site B. Variations in wind speed and solar irradiation were shown to have some impact on grid cost. However, the results pointed out that grid cost in HRES is to a higher degree affected by total cable length in the internal grid than fluctuation in available energy sources. The extent of increase in cable length, the total grid investment cost rises up to 53.4 % for the two case projects.

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:uu-319385
Date January 2016
CreatorsStorgärd, Per
PublisherUppsala universitet, Institutionen för geovetenskaper
Source SetsDiVA Archive at Upsalla University
LanguageEnglish
Detected LanguageEnglish
TypeStudent thesis, info:eu-repo/semantics/bachelorThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0017 seconds