This thesis presents a methodology to incorporate reservoir uncertainties and estimate the loss in project value when facility planning decisions are based on erroneous estimates of input variables. We propose a tank model along with integrated asset development model to simulate the concept selection process. The model endogenizes drilling decisions and includes an option to expand. Key decision variables included in the model are number of pre-drill wells, initial facility capacity and number of well slots. Comparison is made between project value derived under erroneous estimates for reserve size and under an alternate hypothesis. The results suggest loss in project value of up to 40% when reservoir estimates are erroneous. Moreover, both optimistic and pessimistic reserve estimates results in a loss in project value. However, loss in project value is bigger when reserve size is underestimated than when it is overestimated. / text
Identifer | oai:union.ndltd.org:UTEXAS/oai:repositories.lib.utexas.edu:2152/ETD-UT-2010-05-1230 |
Date | 02 November 2010 |
Creators | Singh, Ashutosh |
Source Sets | University of Texas |
Language | English |
Detected Language | English |
Type | thesis |
Format | application/pdf |
Page generated in 0.0018 seconds