Lihir Gold Mine in Papua New Guinea is one of the largest gold mines in the world situated in a seismically sensitive zone. The gold deposit is located in an extinct volcano in close proximity to the sea shore and presents a series of geohazards. Some geohazards are uncommon and include: geothermal outbursts, cavities, water inrush and earthquake/ tsunami. After a major multi-batter (5 benches high) slope failure that occurred on the 1st of October 2009, a team of engineers, lead by the author investigated the incident and made series of recommendations. Arising out of these recommendations, a comprehensive Geohazard Management Plan was formulated by revisiting, revising and putting together all the individual geohazard management plans as a single document.
This thesis describes the outcomes of the investigation and presents an overview and systematic approach in formulation of the Geohazard Management Plan, apart from a summary of the gaps that were identified in the existing system, major contributions that were made as well as the expected improvements and constraints in managing these geohazards. / Mining Engineering
Identifer | oai:union.ndltd.org:LACETR/oai:collectionscanada.gc.ca:AEU.10048/1604 |
Date | 11 1900 |
Creators | Singh, Mohan |
Contributors | Martin, Derek (Civil and Environmental Engineering), Tannant, Dwayne(School of Engineering, University of British Columbia), Fahmy, Sami(Mechanical Engineering) |
Source Sets | Library and Archives Canada ETDs Repository / Centre d'archives des thèses électroniques de Bibliothèque et Archives Canada |
Language | English |
Detected Language | English |
Type | Thesis |
Format | 3033686 bytes, application/pdf |
Page generated in 0.0019 seconds