M.Ing. / The research is based on the complexity of project management and risk management fields and how applying each field on its own can be problematic. This poses an everyday challenge to project managers when implemented simultaneously and such a problem predominantly exists in the engineering construction field.The challenge faced by project managers is approached throughout the research study by introducing a commonly used six order matrix framework with a high success rate in analysing and dissecting complex fields into small fragments. The framework is known as the Zachman Framework for Enterprise Architecture. However this is only done once a thorough literature review of both project and risk management as well as the limitations of the Zachman Framework have been well documented.Once the Zachman Framework for Construction adaptation is complete, it is then applied to an inner city construction case study. The results of the case study are used to determine if throughout the project lifecycle it has been possible to analyse and implement all project and risk management requirements simultaneously with little or no correction of project constraints.Using a developed integrated risk management tool which graphically tracks aggregate risk( s) in cost and time together with the Zachman Framework for Construction, the case study results reveal that it is possible to increase the ability to simultaneously manage risk and normal activities by concluding that the project constraints (i.e. cost) are accurately estimated and accomplished. In conclusion the research study,discussion and recommendations are made in order to implement all cells within the Zachman Framework for Construction therefore increasing the success of any project and risk management construction field.
Identifer | oai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:uj/uj:8782 |
Date | 03 July 2012 |
Source Sets | South African National ETD Portal |
Detected Language | English |
Type | Thesis |
Page generated in 0.0016 seconds