Return to search

iNET Deployment Process: A Case Study

ITC/USA 2009 Conference Proceedings / The Forty-Fifth Annual International Telemetering Conference and Technical Exhibition / October 26-29, 2009 / Riviera Hotel & Convention Center, Las Vegas, Nevada / Sponsored by the Central Test and Evaluation Investment Program (CTEIP), the integrated Network Enhanced Telemetry (iNET) project has created a proposed architecture for network enhancing aeronautical telemetry. Given the static nature of the current aeronautical telemetry architecture (it has not significantly changed in over 50 years), it is recognized that iNET must be carefully deployed to avoid test disruptions and safety issues. In support of a smooth transition to this new architecture, the Naval Air Warfare Division Aircraft (NAWCAD) conducted an extensive continuous process improvement project. This paper will describe the process, defined and launched by this study, to assure the safe deployment of iNET.

Identiferoai:union.ndltd.org:arizona.edu/oai:arizona.openrepository.com:10150/606009
Date10 1900
CreatorsFaulstich, Raymond, Skelley, Daniel, Anderson, Brian
ContributorsComputer Science Corporation, NAVAIR
PublisherInternational Foundation for Telemetering
Source SetsUniversity of Arizona
Languageen_US
Detected LanguageEnglish
Typetext, Proceedings
RightsCopyright © held by the author; distribution rights International Foundation for Telemetering
Relationhttp://www.telemetry.org/

Page generated in 0.002 seconds