Return to search

Silniční most / Road bridge

The content of the thesis is to solve the relocation of railroad and bicycle path. I tis a bridge with five field. 2 studies were designed, one of which was elaborated within the Framework of this thesis. Was selected option no. 1 concrete prefabricated T-beams with coupled concrete slab The static model was created in Scia Engineer 18.1. and reports were processed manually, according to EC. The effects of wind, snow, acceleration and braking forces have been neglected.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:392128
Date January 2019
CreatorsMezera, David
ContributorsDiviš, Dalibor, Panáček, Josef
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0024 seconds