This article examines the problem of production line delays in a textile small- and medium-sized enterprise (SME) that produces polyester fibre from recycled bottles, based on orders. Factors that have resulted in production line delays include prolonged unscheduled maintenance time, and preparations and adjustments prior to operating the equipment. To address the problem, a model was developed applying lean manufacturing tools through change management, with the aim of increasing equipment availability and useful life. To validate the model, a pilot was developed to determine how the increase in equipment availability helps reduce delays in the production line, which eventually improves completion of customer orders.
Identifer | oai:union.ndltd.org:PERUUPC/oai:repositorioacademico.upc.edu.pe:10757/656403 |
Date | 06 April 2020 |
Creators | Arrascue-Hernandez, G., Cabrera-Brusil, J., Chavez-Soriano, P., Raymundo-Ibañez, C., Perez, M. |
Publisher | Institute of Physics Publishing |
Source Sets | Universidad Peruana de Ciencias Aplicadas (UPC) |
Language | English |
Detected Language | English |
Type | info:eu-repo/semantics/article |
Format | application/pdf |
Source | Universidad Peruana de Ciencias Aplicadas (UPC), Repositorio Académico - UPC, IOP Conference Series: Materials Science and Engineering, 796, 1 |
Rights | info:eu-repo/semantics/openAccess, Attribution-NonCommercial-ShareAlike 4.0 International, http://creativecommons.org/licenses/by-nc-sa/4.0/ |
Relation | https://iopscience.iop.org/article/10.1088/1757-899X/796/1/012017/meta |
Page generated in 0.0017 seconds