Computer Simulation Of A Complete Biological Treatment Plant

Nitrogen and phosphorus removal is often required before discharge of treated wastewater to sensitive water bodies. Kayseri Wastewater Treatment Plant (KWWTP) is a biological wastewater treatment plant that includes nitrogen and phosphorus removal along with carbon removal. The KWWTP receives both municipal wastewater and industrial wastewaters. In this study, KWWTP was modeled by using a software called GPS-X, which is developed for modeling municipal and industrial wastewaters. The Activated Sludge Model No.2d (ASM2d) developed by the International Association on Water Quality (IAWQ) was used for the simulation of the treatment plant. In this model, carbon oxidation, nitrification, denitrification and biological phosphorus removal are simulated at the same time.
During the calibration of the model, initially, sensitivities of the model parameters were analyzed. After sensitivity analysis, dynamic parameter estimation (DPE) was carried out for the optimization of the sensitive parameters. Real plant data obtained from KWWTP were used for DPE. The calibrated model was validated by using different sets of data taken from various seasons after necessary temperature adjustments made on the model.
Considerably good fits were obtained for removal of chemical oxygen demand (COD), total suspended solids (TSS) and nitrogen related compounds. However, the results for phosphorus removal were not satisfactory, probably due to lack of information on volatile fatty acids concentration and alkalinity of the influent wastewater.

Identiferoai:union.ndltd.org:METU/oai:etd.lib.metu.edu.tr:http://etd.lib.metu.edu.tr/upload/12609708/index.pdf
Date01 July 2008
CreatorsTopkaya, Pinar
ContributorsGokcay, Celal
PublisherMETU
Source SetsMiddle East Technical Univ.
LanguageEnglish
Detected LanguageEnglish
TypeM.S. Thesis
Formattext/pdf
RightsTo liberate the content for public access

Page generated in 0.0012 seconds