Return to search

Two-stage hyhrid flowshop scheduling in a metalworking company using genetic algorithm

published_or_final_version / Industrial and Manufacturing Systems Engineering / Master / Master of Philosophy

  1. 10.5353/th_b4175810
  2. b4175810
Identiferoai:union.ndltd.org:HKU/oai:hub.hku.hk:10722/54649
Date January 2009
CreatorsLuo, Hao, 羅浩
ContributorsHuang, GQ
PublisherThe University of Hong Kong (Pokfulam, Hong Kong)
Source SetsHong Kong University Theses
LanguageEnglish
Detected LanguageEnglish
TypePG_Thesis
Sourcehttp://hub.hku.hk/bib/B41758109
RightsThe author retains all proprietary rights, (such as patent rights) and the right to use in future works., Creative Commons: Attribution 3.0 Hong Kong License
RelationHKU Theses Online (HKUTO)

Page generated in 0.0021 seconds