The present thesis deals with the description of the current state on the course of Morava river from small hydro Kromeriz after a small water plant Hodonin. Subsequently, I deal with the description of search of weir plants and weirs for the construction of small hydropower (especially their heads, structures and, where appropriate, possible adaptation). Then I deal with completion new hydroelectric plants on this founded weir plants and weirs which are in section between the small hydroelectric power Kromeriz and Lanžhot city on the Czech Republic side (Brodské on the Slovak Republic side). In this work is mainly focus on the calculation of installed performance in individual locations (and also the calculation of achievable performance in these locations), machinery design (for the use of selected sets from Hydrohrom company) and the way the configuration of the power switch. If it is in those places, řeším even more possibilities of this construction is splavnění view of the river, especially in the field of Hodonin - Lanžhot. In addition, deals with the design of line side cubicle of each switch to local distribution networks (draft routes). In the last phase deals with the size of the production in each generation, calculations of costs of constructing these plants, approximate calculation of the production (of the flows of 2007) and time of return on your investment in the construction.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:217726 |
Date | January 2008 |
Creators | Dočkal, Jiří |
Contributors | Malý, Jiří, Matoušek, Antonín |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0017 seconds