Return to search

Qualidade, desempenho operacional e custos de plantios, manual e mecanizado, de Eucalyptus grandis, implantados com cultivo mínimo do solo / Quality, operational performance and cost of eucalyptus grandis hand and machine planting, implemented with minimal tillage.

O método de plantio manual de mudas de árvores é predominante no Brasil. Para a redução dos custos com mão-de-obra, aumento de produtividade e qualidade operacional, o plantio manual deve ser substituído total ou parcialmente por operações mecanizadas. Com esse enfoque foram avaliadas as atividades de plantios manual e mecanizado de eucaliptos, bem como de preparo mecanizado do solo, em área pertencente a uma empresa florestal. O plantio manual foi feito por onze trabalhadores rurais, com o uso da transplantadora de acionamento manual. O plantio mecanizado foi realizado por uma máquina de transplantio de mudas, operada por um trabalhador rural e tracionada por um trator. Na área do estudo foram locadas duas parcelas amostrais, formando uma malha de setenta e cinco pontos amostrais para cada sistema de plantio. Os itens do preparo do solo avaliados foram a profundidade do sulco, o diâmetro dos torrões e o volume cilíndrico dos galhos de madeira sobre a faixa de sulcamento. O itens dos sistemas de plantio avaliados foram a presença de defeitos da operação, a distância entre plantas, a altura da parte aérea das mudas e a sobrevivência das plantas após um mês de idade. As ferramentas da qualidade total utilizadas foram os histogramas, o diagrama de causa e efeito, os gráficos de Pareto e de controle. As análises estatísticas dos resultados foram feitas pelo teste t e pelo teste de qui-quadrado Para avaliar o desempenho operacional do sistema manual estimou-se somente a capacidade de campo operacional. No sistema mecanizado foram estimadas as capacidades de campo efetiva e operacional. Nos dois sistemas de plantio foram estimados também os custos horários e operacionais das máquinas e da mão-de-obra. Entre os sistemas de plantio, a distância entre plantas foi diferente estatisticamente, com melhor distribuição das mudas no sistema manual. O número de defeitos por muda plantada foi semelhante estatisticamente entre os sistemas de plantio. Os principais defeitos do sistema manual foram as mudas plantadas com colo encoberto pelo solo e as mudas plantadas fora do centro do sulco, os quais representaram 72,8% do total. No sistema mecanizado, esses defeitos, somados às mudas não plantadas e mudas não firmes, representaram 76,7% do total. A altura da parte aérea foi diferente estatisticamente, tanto no plantio como um mês após. A sobrevivência das mudas efetivamente plantadas, após um mês de idade, foi semelhante estatisticamente. Concluiu-se, assim, que a qualidade em ambos os sistemas de plantio não variaram dentro de padrões aceitáveis pela empresa florestal. O tempo produtivo do sistema de plantio mecanizado foi igual a 48,2%, gerando uma capacidade de campo operacional 60,0% menor do que no sistema manual. Inferiu-se que o número médio de mudas plantadas por trabalhador por hora foi igual a 95 no sistema manual, enquanto que no sistema mecanizado foi igual a 205. O custo operacional estimado do sistema mecanizado foi 44,9% maior do que no sistema manual, fato devido a baixa capacidade de campo operacional observada no sistema mecanizado. / Hand planting of tree seedlings is the predominant method in Brazil. In order to reduce labor costs, increase productivity, and improve operational quality, hand planting should be totally or partially replaced by machine operations. Having this in mind, eucalyptus’ hand and machine planting activities were assessed, as well as those of mechanical tillage, in an area belonging to a forestation company. Hand planting had been carried out by 11 rural workers by using a planting tube. Machine planting had been carried out by using a seedling transplant machine, which was operated by a rural worker and pulled by a tractor. In the study area, two sampling parts were allocated, forming a web with 75 sampling points for each planting system. Tillage items that were assessed included furrow depth, stone diameter, and the cylindrical volume of wood branches on the furrow belt. Planting system items that were assessed included the presence of operation defects, distance between plants, height of the top portion of the seedlings, and plant survival after one month of age. Total quality tools included histograms, cause and effect diagram, control graphs, and Pareto's graphs. Statistical analyses of the results were performed by using test and qui-square test. To evaluate hand planting system’s operational performance, only the operational field capacity was estimated. As for the machine system, effective and operational field capacities were estimated. Labor and machine hourly costs, as well as the operational costs for both planting systems were assessed. When comparing planting systems, the distance between plants was statistically different, with hand planting system showing better seedling distribution. The number of defects per planted seedling was statistically similar for both planting systems. The major defects in the hand planting system were seedlings planted with soil-covered base and those planted out of the furrow center, which represented 72.8% of the total. With the machine system, these defects, in addition to non-planted and loose seedlings, represented 76.7% of the total. The height of the top portion was statistically different, both when planting and after one month. The survival of effectively planted seedlings after one month of age was statistically similar. Thus, we concluded that the quality of both planting systems did not vary within the standards that are acceptable for the forestation company. Machine planting system's productive time was 48.2%, and generated an estimated operational field capacity 60.0% less to that for the hand planting system. The average number of planted seedlings per worker by hour was inferred to be equal to 95 in the hand planting system, whereas it was equal to 205 in the machine system. The operational cost for the machine system was estimated to be 44.9% greater to that for the hand planting system, which is due to the low operational field capacity observed in the machine system.

Identiferoai:union.ndltd.org:usp.br/oai:teses.usp.br:tde-15082003-150926
Date03 July 2003
CreatorsFessel, Vitor Augusto Graner
ContributorsMilan, Marcos
PublisherBiblioteca Digitais de Teses e Dissertações da USP
Source SetsUniversidade de São Paulo
LanguagePortuguese
Detected LanguageEnglish
TypeDissertação de Mestrado
Formatapplication/pdf
RightsLiberar o conteúdo para acesso público.

Page generated in 0.0028 seconds