From the Proceedings of the 1976 Meetings of the Arizona Section - American Water Resources Assn. and the Hydrology Section - Arizona Academy of Science - April 29-May 1, 1976, Tucson, Arizona / Strip mining leaves behind spoils to be recontoured to maximize the benefit of livestock production on the rehabilitated land. This paper designs watersheds to achieve a balance between two main range livestock requirements, forage and stock water by way of grading and furrowing man-made slopes. The three design attributes, surface configuration, surface treatment, and range management policy are optimized with respect to maximal profit accounting for natural uncertainties in 3 variables, viz., time interval between storm arrivals, precipitation per storm event, and duration of the storm event. Runoff and sedimentation are modeled on an event basis as functions of said random variables. The stock water reservoir at the bottom of the watershed is dredged periodically. The stochastic model is applied to the Black Mesa in Northern Arizona which is in the process of being strip-mined for coal.
Identifer | oai:union.ndltd.org:arizona.edu/oai:arizona.openrepository.com:10150/301004 |
Date | 01 May 1976 |
Creators | Brinck, Fritz H., Fogel, Martin M., Duckstein, Lucien |
Contributors | Department of Systems and Industrial Engineering, University of Arizona, Tucson, AZ 85721, School of Renewable Natural Resources and Department of Hydrology and Water Resources, University of Arizona, Tucson, AZ 85721, Departments of Systems and Industrial Engineering and Hydrology & Water Resources, University of Arizona, Tucson, AZ 85721 |
Publisher | Arizona-Nevada Academy of Science |
Source Sets | University of Arizona |
Language | en_US |
Detected Language | English |
Type | text, Proceedings |
Rights | Copyright ©, where appropriate, is held by the author. |
Page generated in 0.0021 seconds