Return to search

Central Arizona Project Concept of Operation

From the Proceedings of the 1979 Meetings of the Arizona Section - American Water Resources Assn. and the Hydrology Section - Arizona - Nevada Academy of Science - April 13,1979, Tempe, Arizona / The Central Arizona Project (CAP), presently under construction, will convey Arizona's remaining entitlement of Colorado River water to three central Arizona counties. As a result of the recently completed CAP Real-Time Operations Study, a concept of operation has been developed. The concept of operations defines three types of operation beginning with an initial manned operation in 1985, a transition operation, and a permanent operation using a computer assisted remote control system. Under the permanent operation, computer models will be run in advance to define weekly and daily pumping plant and check gate schedules.

Identiferoai:union.ndltd.org:arizona.edu/oai:arizona.openrepository.com:10150/301184
Date13 April 1979
CreatorsSpringer, Frank C., Jr., Graves, P. E., Graves, Albert L.
ContributorsOperations and Maintenance Branch, Arizona Projects Office, U.S. Bureau of Reclamation, Phoenix, Arizona
PublisherArizona-Nevada Academy of Science
Source SetsUniversity of Arizona
Languageen_US
Detected LanguageEnglish
Typetext, Proceedings
RightsCopyright ©, where appropriate, is held by the author.

Page generated in 0.002 seconds