From the Proceedings of the 1987 Meetings of the Arizona Section - American Water Resources Association, Hydrology Section - Arizona-Nevada Academy of Science and the Arizona Hydrological Society - April 18, 1987, Northern Arizona University, Flagstaff, Arizona / The building of the Colorado River Storage Project dams during the 1956-1976 period obviously altered the natural flow regime of the Colorado River through the Grand Canyon. As desired, the spring snow-melt generated flows were retarded and the annual fluctuations were considerably dampened. This paper presents an analysis of the seasonal flow changes caused by the CRSP structures and highlights some of the characteristics of historic Colorado River flows. It also suggests that a strategy for recreating the pre-dam ecosystem would be to emulate some significant characteristics of the pre-dam flows.
Identifer | oai:union.ndltd.org:arizona.edu/oai:arizona.openrepository.com:10150/296374 |
Date | 18 April 1987 |
Creators | Avery, Charles C., Beus, Stanley S., Carothers, Steven W. |
Contributors | School of Forestry, Northern Arizona University, Flagstaff, Arizona, Department of Geology, Northern Arizona University, Flagstaff, Arizona |
Publisher | Arizona-Nevada Academy of Science |
Source Sets | University of Arizona |
Language | en_US |
Detected Language | English |
Type | text, Proceedings |
Rights | Copyright ©, where appropriate, is held by the author. |
Page generated in 0.0019 seconds