In this master´s thesis I am focusing on the Construction technology project of Snowboard Zezula Company. Major part of my thesis informs on a technical report for a construction technology project, a time and a financial plan of a construction, a realization study of the main technological stage, a plan of the main construction mechanism, a project of a construction site device with drawings, a financial calculation of the construction site devices and some technological rules, checking and testing plan for designed operations. Lastly I compare the two different designs of a load-bearing construction level and I calculate time of sheat removing with the economical calculation of the work fissure number.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:227055 |
Date | January 2014 |
Creators | Němec, Martin |
Contributors | Pražáková, Jana, Diaz, Yvetta |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0023 seconds