This thesis examines the optimal scheduling of a hydroelectric power plant with cascaded reservoirs each with multiple generating units under uncertainty after testing three linearization methods. These linearization methods are Successive Linear Programming, Piecewise Linear Approximations, and a Hybrid of the two together. There are two goals of this work. The first goal of this work aims to replace the nonconvex mixed-integer nonlinear program (MINLP) with a computationally efficient linearized mixed-integer linear program (MILP) that will be capable of finding a high quality solution, preferably the global optimum. The second goal is to implement a stochastic approach on the linearized method in a pseudo-rolling horizon method which keeps the ending time step fixed. Overall, the Hybrid method proved to be a viable replacement and performs well in the pseudo-rolling horizon tests. / Thesis / Master of Applied Science (MASc)
Identifer | oai:union.ndltd.org:mcmaster.ca/oai:macsphere.mcmaster.ca:11375/23995 |
Date | January 2019 |
Creators | Tikk, Alexander |
Contributors | Swartz, Christopher L. E., Chemical Engineering |
Source Sets | McMaster University |
Language | English |
Detected Language | English |
Type | Thesis |
Page generated in 0.0043 seconds