The thesis deals with a design of a highway bridge with multiple spans. The bridge is constructed for highway D1 and goes across the river Bečva close to the city Přerov. Two different solutions were carried out from which a solution with subsequently prestressed box girder was chosen. Static model and load actions were modelled in program Scia Engineer 2016.0. Design checks were done manually according to corresponding Eurocodes. Load actions from wind, uneven support settling and horizontal actions from transit were neglecte.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:265405 |
Date | January 2017 |
Creators | Pidima, Jan |
Contributors | Pachl, Radek, Panáček, Josef |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0021 seconds