The purpose of this study is to develop a method for predicting monthly flow duration curves for ungaged basins that are suitable for estimating average annual flow, and installed capacity and average annual energy generation at potential sites for hydropower development. The procedures were tested by developing monthly rainfall duration curves for five sample watersheds and then developing flow duration curves from the rainfall data. The methods were evaluated by comparing the predicted monthly flow duration curves to daily and monthly flow duration curves based on field data from the selected sites because a plant's potential energy output can be computed directly from a flow duration curve. The methods tested fit duration curves based on field data reasonably well and are suitable for preliminary evaluation of hydropower developments in ungaged basins.
Identifer | oai:union.ndltd.org:arizona.edu/oai:arizona.openrepository.com:10150/276585 |
Date | January 1987 |
Creators | Ahn, Taejin, 1957- |
Contributors | Petersen, Margaret S. |
Publisher | The University of Arizona. |
Source Sets | University of Arizona |
Language | en_US |
Detected Language | English |
Type | text, Thesis-Reproduction (electronic) |
Rights | Copyright © is held by the author. Digital access to this material is made possible by the University Libraries, University of Arizona. Further transmission, reproduction or presentation (such as public display or performance) of protected items is prohibited except with permission of the author. |
Page generated in 0.0016 seconds