The Research of Subcontractors¡¦ Management in the Construction Industry ¡V Based On A Company

This research is mainly discussing the relationship under the present industry division of
labor tendency; subcontractor executes ability and builds the factory, and how these
connections influence the quality of work, time limit for the work project. How to
utilize and manage the subcontractors to complete the project effective, this subject is at
present domestic builds the company to have to consummate pondered and planned.
At the same time, because the most of subcontractor which the specialized technology
and the financial ability are insufficient, the contract works out the penal regulations
regarding to build the factory whether really has the safeguard. This research will
discuss how to maximum the profit of industry and subcontractors via subcontract
management, moreover, to compare with case study will get more practical plan and
strategy. This research conclusion summary as follows shows.
1. Subcontractor choices: Based on long production period and the time limit, to
prevent significant loss, ¡§Time¡¨ is one of important key factor to select
subcontractors. To prevent many possibly the project question, which must
pay great attention to following several points when chooses the specialized
subcontractors: (1) the qualified specialty subcontractors which been certify by
investigated; (2) whether has the passing cooperation experience, when the
project once starts, no matter any factor, if the temporary desire replaces
subcontractors, not only facing the people issue and also must undertake the
extra cost disbursement; (3)inquires the same business recommendation
specialty of subcontractors experience a same nature same rank.
2. Subcontract management: (1) the contract execution, most importantly the
V
routine work surveillance, therefore in the contract management, must involve
the subcontractor management; (2) besides, maintain a fair cooperation
relations, and implement the project by the positive cause, so first, the project
can have completing which the quality and also safeguards.

Identiferoai:union.ndltd.org:NSYSU/oai:NSYSU:etd-0627107-143646
Date27 June 2007
CreatorsSu, Chen-da
ContributorsBih-Shiaw Jaw, Ying-Chun Li, Ming-Chu Yu, Yu-Ping Wang
PublisherNSYSU
Source SetsNSYSU Electronic Thesis and Dissertation Archive
LanguageCholon
Detected LanguageEnglish
Typetext
Formatapplication/pdf
Sourcehttp://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0627107-143646
Rightsnot_available, Copyright information available at source archive

Page generated in 0.0016 seconds