Submitted by Johnny Rodrigues (johnnyrodrigues@ufcg.edu.br) on 2018-07-30T19:06:38Z
No. of bitstreams: 1
CAMILLA FALCONI CRISPIM - DISSERTAÇÃO PPGCC 2013..pdf: 21498692 bytes, checksum: 0ddcf6e67e912aaa0d984982e73f8e76 (MD5) / Made available in DSpace on 2018-07-30T19:06:38Z (GMT). No. of bitstreams: 1
CAMILLA FALCONI CRISPIM - DISSERTAÇÃO PPGCC 2013..pdf: 21498692 bytes, checksum: 0ddcf6e67e912aaa0d984982e73f8e76 (MD5)
Previous issue date: 2013-03-15 / Manobras são executadas na rede elétrica para que não haja interrupção no fornecimento
de energia, causada por eventos aleatórios, como falha ou sobrecarga de equipamentos; ou para a realização de manutenção preventiva nestes equipamentos. A geração de manobras é normalmente manual e a sua elaboração pode demorar de uma hora e a um dia, dependendo da sua complexidade e do número de equipamentos envolvidos. O pouco tempo para a geração das manobras, principalmente em situações de contingência, aumenta a probabilidade de ocorrência de erros nas manobras elaboradas. Os fatores relacionados à demora na geração, às falhas na análise dos efeitos da manobra na rede elétrica e à alta susceptibilidade de erros, podem afetar negativamente o sistema elétrico e a companhia elétrica, diminuindo a segurança no sistema e aumentando as perdas monetárias associadas principalmente à indisponibilidade de equipamentos e à interrupção do fornecimento de energia. Este trabalho propõe uma nova abordagem para a geração automática de manobras para sistemas eletroenergéticos. Esta abordagem tem as principais características de uma solução ideal para o problema: (i) se baseia na topologia de tempo real da rede elétrica; (ii) usa regras de intertravamento baseadas na configuração topológica da rede e nos princípios elétricos dos dispositivos, garantindo assim a segurança do sistema e do pessoal da companhia elétrica; e (iii) usa algoritmos genéricos que independem dos tipos de arranjos topológicos, bem como do número de equipamentos na subestação. Para verificar a corretude da solução no escopo de uma companhia elétrica real, as manobras geradas automaticamente são comparadas
às manobras padrão elaboradas manualmente pelos operadores e/ou supervisores da
Companhia Hidroelétrica do São Francisco (CHESF). Ao todo, mais de 1300 roteiros foram comparados. Para a liberação de disjuntor, o percentual de acerto foi de 91,1%; e para a normalização de disjuntor, o percentual de acerto foi de 90,4%. A mediana dos tempos de geração automática destas manobras foram de 14ms e 16ms para liberação e normalização de disjuntor, respectivamente. Estes tempos apontam ganho significativo no tempo gasto para a geração de uma manobra. A outra forma de validação da técnica proposta baseia-se em um sistema prova-de-conceito (SmartSwitch). Esse sistema se destina aos operadores e supervisores da CHESF. Um grupo selecionado de especialistas na geração de manobras é responsável pela avaliação da usabilidade do sistema SmartSwitch e da corretude das manobras geradas automaticamente. A avaliação inicial feita por este grupo mostra que a técnica é capaz de gerar, em situações normais de topologia, operações de seccionamento corretas e seguras do ponto de vista elétrico. Percebeu-se também alto nível de aceitação do sistema SmartSwitch por parte dos operadores e supervisores de operação da CHESF, o que prova a contribuição do sistema para a eficácia do processo de geração de manobras na companhia colaboradora. / Switching sequences executed in the electrical grid aim to prevent electric power provision
interruptions, which may be caused by random events, such as equipment faults or overloads; or equipment maintenance. Switching sequence generation is usually manual, and can last between one hour and one day, according to the switching sequence complexity and the number of equipment involved. The limited time for switching sequence generation, especially in contingency circumstances, increases the probability of errors in the resulting switching sequences. Factors such as delay in switching sequence generation, failure in analyzing the switching sequence's effects on the electrical grid, and susceptibility to errors can negatively affect the electric system and the electric power company, decreasing system security, and increasing monetary losses mainly associated with equipment unavailability and electric power provision interruption. This study presents and evaluate a new approach for automatically generating switching sequences in electric substations; the proposal possesses the main characteristics to ideally solve the problem. The technique, for automatically generate switching sequences, (i) is based on the power grid's real-time topology; (ii) uses interlocking rules based on the grid's topological configuration in order to guarantee security for the system and for the workers; (iii) uses algorithms that are independent of the equipment's topological disposition and the substation's size. To verify the correctness of solution in the scope of a real electric company, the automatically generated switching sequences was compared
to standard switching sequences made manually by CHESF operation supervisors or
operators. In ali, more the 1300 scripts were compared. For switching sequences to release circuit breaker during maintenance periods, the percentage of correct switching sequence was 91,1%; and for switching sequence to restore circuit breaker, the percentage of correct switching sequence was 90,4%. The execution time was 14ms and 16ms, respectively. The second validation stage is based on proof-of-concept system, named SmartSwitch. The system is presented in this work and is intended to be used by CHESF operation supervisors and operators. A selected group of specialists in switching sequence generation is responsible for evaluating the system regarding its usability and correctness. The initial evaluation made by specialists group showed that technique is able to generate, in normal topology, correct and safe switching operations from electric point of view. Also, it was noticed that the tool has a high levei of acceptance by the company's operators and supervisors, due to its low maintenance needs.
Identifer | oai:union.ndltd.org:IBICT/oai:localhost:riufcg/1292 |
Date | 30 July 2018 |
Creators | CRISPIM, Camilla Falconi. |
Contributors | SAUVÉ, Jacques Philippe., FIGUEIREDO, Jorge Cesar Abrantes de., MOTA, Wellington Santos. |
Publisher | Universidade Federal de Campina Grande, PÓS-GRADUAÇÃO EM CIÊNCIA DA COMPUTAÇÃO, UFCG, Brasil, Centro de Engenharia Elétrica e Informática - CEEI |
Source Sets | IBICT Brazilian ETDs |
Language | Portuguese |
Detected Language | Portuguese |
Type | info:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis |
Source | reponame:Biblioteca de Teses e Dissertações da UFCG, instname:Universidade Federal de Campina Grande, instacron:UFCG |
Rights | info:eu-repo/semantics/openAccess |
Page generated in 0.0023 seconds