This theses aims to propose two alternatives of optimised construction procedures for the reconstruction of the railway station Mikulášovice dolní nádraží. The reconstruction is based on the design provided by Metroprojekt Praha a.s. Each alternative describes suitable mechanization, coordination of works, including needed number of workers, coordination of the works and the total implentation cost analysis. As the thesis deals with reconstruction, it also considers substitute transportation plan. The details are summarized in extensive schedules. The two alernative are compared and evaluated.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:455462 |
Date | January 2022 |
Creators | Šardická, Klára |
Contributors | Wrana, Radim, Svoboda, Richard |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds