Return to search

An investigation into the management of successful emerging general building and civil engineering contractors in Gauteng

A research report submitted to the Faculty of Engineering and the Built Environment, University of the Witwatersrand, Johannesburg, in partial fulfilment of the requirements for the degree of Master of Science in Engineering
April 2017 / The construction industry in South Africa has an array of challenges. These challenges make it difficult for emerging contractors to establish and maintain successful companies. The purpose of this report is to establish why there are so few successful emerging contractors in the construction industry. In this study, the success of an emerging contracting company was judged by the survival of that company for a minimum period of five years and an improvement in the company’s CIDB grade by at least three levels during its existence. Structured interviews were conducted with a sample of 10 successful emerging contractors in Gauteng. The study found that technical capacity is one of the components of successful emerging contracting companies. It also found that technical capacity, inconsistent work opportunities and financial constraints are challenges that affect contractors when trying to increase their CIDB grade. The successful emerging contractors in the study utilised various strategies to overcome challenges in the industry, however, these strategies were flexible for changing circumstances and new opportunities. / MT 2017

Identiferoai:union.ndltd.org:netd.ac.za/oai:union.ndltd.org:wits/oai:wiredspace.wits.ac.za:10539/23548
Date January 2017
CreatorsGovender, Neil
Source SetsSouth African National ETD Portal
LanguageEnglish
Detected LanguageEnglish
TypeThesis
FormatOnline resource (viii, 99 leaves), application/pdf, application/pdf

Page generated in 0.0019 seconds