This thesis describes the reconstruction network 10 kV HV networks in a teaching hospital in the transition to a new 22 kV voltage level according to valid regulations. The paper describes the current state of technological equipment and its gradual replacement with new technology at 22 kV voltage level in each power units so as not to limit the operation of the hospital. For this purpose, the new backup system for rotating spare resources. The thesis deals with new input distribution, which will serve as a transfer point between the customer and distributor of electricity as well as advance the existing technological equipment.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:219386 |
Date | January 2012 |
Creators | Blažek, Tomáš |
Contributors | Procházka, Aleš, Orságová, Jaroslava |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0018 seconds