The grid code, FIKS, from the Norwegian transmission system operator (TSO), Statnett, states that synchronous generators > 25MVA, must have a static excitation system. However, an improved brushless excitation system is in operation on some commercial power plants (36MVA, 93.75rpm & 52MVA, 166.67rpm) with grid-assisting performance beyond the conventional static system. The convenional diode bridge is replaced with a remote-controlled thyristor bridge on the shaft. If wireless communication is not allowed, a control signal through brushes should be employed instead. The thesis explores the expected new era for large brushless hydrogenerators. The proposed brushless system have benefits of reduced regular maintenance due to elimination of brushes and reduced unscheduled maintenance due to redundancy; causing a redused cost-of-energy. A six-phase exciter design with a hybrid-mode thyristor bridge interface leads to improved fault-tolerance, better controllability, minimized torque pulsations and reduced armature currents of the exciter. Excitation boosting (EB) capability is included in the brushless system without additional components or circuitry, contrary to the static excitation system. The brushless excitation system is made insensitive to voltage dips in the interconnected grid, causing improved fault ride-through (FRT) capability and power system stabilizer (PSS) actions.
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:uu-317780 |
Date | January 2017 |
Creators | Nøland, Jonas Kristiansen |
Publisher | Uppsala universitet, Elektricitetslära, Uppsala |
Source Sets | DiVA Archive at Upsalla University |
Language | English |
Detected Language | English |
Type | Doctoral thesis, comprehensive summary, info:eu-repo/semantics/doctoralThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Relation | Digital Comprehensive Summaries of Uppsala Dissertations from the Faculty of Science and Technology, 1651-6214 ; 1491 |
Page generated in 0.0019 seconds