Tilt-up construction basically involves job-site prefabrication of concrete building members under controlled and relatively economical conditions. This master’s report presents tilt-up design procedures, along with construction procedures and planning at the job-site, erection, finishing and architectural treatments. It is intended to bring together the five steps of design, planning, construction, erection, and finishing which are crucial to a successful tilt-up project. / text