The diploma thesis is dealing with selected parts of construction technology project of modernization the oldest and the most busiest highway D1 – tract 21 near Velká Bíteš. This thesis leads to solve the problem of highway reconstruction during the unrestricted traffic . Project is divided into constituent phases. I have designed phase time-schedule, the most important machine schedule and the traffic leading scheme. There was chosen one particular tract and there were designed following documents: detailed time-schedule, material supply plan and structure process scheme. In addition the following documents have been designed: technological method of concrete highway layers, inspection and test plan, a situation of building equipment, technical report of the object, health and safety solution.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:265515 |
Date | January 2017 |
Creators | Kocman, Jan |
Contributors | Štěpán, Richard, Motyčka, Vít |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0094 seconds