Return to search

Propuesta de una herramienta tecnológica basada en el método de la cadena crítica para la gestión de equipos compartidos en empresas medianas que realizan multiproyectos de construccion en Lima / Proposal of a technological tool based on the critical chain ​​method for the management of shared equipment in medium-sized companies that carry out multiprojects of construction in lima

Hoy en día, la ciudad de Lima cuenta con varias empresas constructoras, todas ellas cuentan con diferentes equipos ya sean propios o en alquiler. Estas empresas tienen diversos proyectos algunos de estos desarrollados en simultáneo denominados también multiproyectos. Los equipos son parte esencial para que el rendimiento de cualquier construcción sea elevado, sin embargo, la mala gestión de este recurso genera retraso y pérdidas de dinero. Teniendo esta problemática nos basamos en el método de la cadena crítica para la gestión de equipos compartidos, puesto que este método se basa en la disminución de incertidumbre de los proyectos y ser optimistas en la fecha de culminación. La propuesta desarrollada en la presente tesis facilita el manejo de los equipos compartidos durante la programación de estos. Además, es un software que ayuda a tener una programación ordenada y fácil de usar, con la finalidad de que el usuario no se complique durante el uso de la herramienta tecnológica. El software GesZech es creado con la finalidad de que los equipos que se encuentran en un multiproyecto se gestionen de manera adecuada y rápida, este software tiene resúmenes mensuales y diarios por medio de diagramas de Gantt, además de tener indicadores para cada equipo con respecto al día transcurrido, todo esto a tiempo real. Así, si se genera algún cambio los usuarios que tienen acceso al software podrán observarlo sin ninguna restricción. / Today, the city of Lima has several construction companies, all of them have different equipment, either their own or for rent. These companies have various projects, some of these developed simultaneously, also called multiprojects. The equipment is an essential part for the performance of any construction to be high, however, the mismanagement of this resource generates delay and losses of money. Having this problem, we rely on the critical chain method for managing shared teams, since this method is based on reducing the uncertainty of projects and being optimistic on the completion date. The proposal developed in this thesis facilitates the management of shared teams during their programming. In addition, it is a software that helps to have an orderly and easy-to-use programming, so that the user does not get complicated during the use of the technological tool. The GesZech software is created with the purpose that the teams that are in a multiproject are managed adequately and quickly, this software has monthly and daily summaries through Gantt charts, in addition to having indicators for each team regarding the day passed, all this in real time. Thus, if a change is generated, the users who have access to the software will be able to observe it without any restriction. / Tesis

Identiferoai:union.ndltd.org:PERUUPC/oai:repositorioacademico.upc.edu.pe:10757/658480
Date02 November 2020
CreatorsChipana Gutierrez, Rocio Marisol, Portilla Gutierrez, Indira Zenina
ContributorsHinostroza Aquino, Alexandra
PublisherUniversidad Peruana de Ciencias Aplicadas (UPC), PE
Source SetsUniversidad Peruana de Ciencias Aplicadas (UPC)
LanguageSpanish
Detected LanguageSpanish
Typeinfo:eu-repo/semantics/bachelorThesis
Formatapplication/pdf, application/epub, application/msword
SourceUniversidad Peruana de Ciencias Aplicadas (UPC), Repositorio Académico - UPC
Rightsinfo:eu-repo/semantics/openAccess, Attribution-NonCommercial-ShareAlike 4.0 International, http://creativecommons.org/licenses/by-nc-sa/4.0/

Page generated in 0.0028 seconds