ITC/USA 2011 Conference Proceedings / The Forty-Seventh Annual International Telemetering Conference and Technical Exhibition / October 24-27, 2011 / Bally's Las Vegas, Las Vegas, Nevada / Launch vehicle equipment reliability is driven by infant mortality failures, which can be eliminated using a prognostic analysis prior, during and/or after the exhaustive and comprehensive dynamic environmental factory acceptance testing. Measuring and confirming equipment performance is completed to increase equipment reliability by identifying equipment that fails during test for repair/replacement. To move to the 100% reliability domain, equipment dynamic environmental factory testing should be followed by a prognostic analysis to measure equipment usable life and identify the equipment that will fail prematurely. During equipment testing, only equipment performance is measured and equipment performance is unrelated to equipment reliability making testing alone inadequate to produce equipment with 100% reliability. A prognostic analysis converts performance measurements into an invasive usable life measurement by sharing test data used to measure equipment performance. Performance data is converted to usable life data provides a time-to-failure (TTF) in minutes/hours/days/months for equipment that will fail within the first year of use, allowing the production of equipment with 100% reliability.
Identifer | oai:union.ndltd.org:arizona.edu/oai:arizona.openrepository.com:10150/595729 |
Date | 10 1900 |
Creators | Losik, Len |
Contributors | Failure Analysis |
Publisher | International Foundation for Telemetering |
Source Sets | University of Arizona |
Language | en_US |
Detected Language | English |
Type | text, Proceedings |
Rights | Copyright © held by the author; distribution rights International Foundation for Telemetering |
Relation | http://www.telemetry.org/ |
Page generated in 0.003 seconds