The aim of diploma thesis is to design a made-up bridge construction over the road network.There were made three studies of bridging which were compared consequently. Two-joint ginder without haunched was selected as the most suitable option and it was designed in details. The construction was assessed according to the ultimate and serviceability limit state.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:265541 |
Date | January 2017 |
Creators | Řezníček, Martin |
Contributors | Čihák, Petr, Nečas, Radim |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0017 seconds