Return to search

Předpjatý dvoutrámový most / Prestressed double tee bridge

The subject of the master thesis is a prestressed double girder bridge with four spans. The bridge carries the D1 motorway over the Olše river and a crossing ramp. The structure is modelled in Scia Engineer and then assessed according to the standards for ultimate and serviceability limit states.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:455424
Date January 2022
CreatorsOndrušek, Martin
ContributorsKulhavý,, Tomáš, Koláček, Jan
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0016 seconds