In this research, we dealt with the original landfill leachate, and put the flowing water by a traditional second one that has dealt with of sewage factory directly with the constructed wetland systems in lab-scale. The purpose the study is to compare the experimental results after dealing the leachate by different constructed wetland process systems which was judge at if the, can reach the water quality standard. The constructed wetland systems in the study were set up in a greenhouse on campus, which were operated between May 2004 and July 2003. Constructed wetland systematic attitude, include Free Water Surface System (FWS) and Subsurface Flow System (SSF) contact but two type constructed wetland system that become mainly. In the test use different waste water sources to feet the systems, and we planted different species of plants, and add extra carbon source. Thus, we can divide the experiment into two stages: (1) From July of 2003 to December of 2003. (2) From February of 2004 to May of 2004. In each stage, we tested three experiment group P1, P2 and total nitrogen of P3 except that the rate is 37¡Ó20%, 50¡Ó11% respectively and -6.1¡Ó37.8%. The removal efficiencies of ammonia nitrogen were estimated equal to 84¡Ó11%, 94¡Ó4% and 60¡Ó24% respectively. For total phosphorus and phosphate, P1 , P2 and P3 system were measured equal to 37¡Ó14%, 68¡Ó16% and 77¡Ó16%and 44¡Ó16%, 75¡Ó8% and 80¡Ó17% respectively . The ammonia nitrogen temperature correction coefficient (£c value) were calculated to be 0.921, 0.949, 0.926, 1.043 and 0.785 for P1, P2, P3, U1 and U2 system, respectively. The phosphate temperature correction coefficients (£c values ) were measured to be 1.006, 0.981, 1.070, 1.235 and 0.843 respectively for P1, P2, P3, U1 and U2 system. In order to increase the removal efficiencies of total nitrogen, it was always by adding carbon source. The experimental result showed, that it is add carbon source wait by system to SSF , its President nitrogen is it flow water pollution load leave 2g/m2/day nearly to put to have, and has not added water pollution load has flowed in the putting of the carbon source nearly has 6g/m2/day left, And nearly remain under 1g/m2/day in the putting and flowing water pollution load of TON, and not added the putting of the carbon source water pollution load has flowed nearly has 2-3g/m2/day left. This result showed that high total nitrogen removal efficiencies were by adding carbon source.
Identifer | oai:union.ndltd.org:NSYSU/oai:NSYSU:etd-0904104-192034 |
Date | 04 September 2004 |
Creators | Tsai, Kai-yuan |
Contributors | Lei Yang, Shuh-ren Jing, Chih-ming Kao |
Publisher | NSYSU |
Source Sets | NSYSU Electronic Thesis and Dissertation Archive |
Language | Cholon |
Detected Language | English |
Type | text |
Format | application/pdf |
Source | http://etd.lib.nsysu.edu.tw/ETD-db/ETD-search/view_etd?URN=etd-0904104-192034 |
Rights | not_available, Copyright information available at source archive |
Page generated in 0.0022 seconds