Return to search

Desenvolvimento de sistema para verificação metrológica de transformadores de corrente IN SITU em sistemas de alta tensão utilizando transdutor óptico

Submitted by Irvana Coutinho (irvana@ufpa.br) on 2015-04-24T13:03:56Z
No. of bitstreams: 2
license_rdf: 22974 bytes, checksum: 99c771d9f0b9c46790009b9874d49253 (MD5)
Dissertacao_DesenvolvimentoSistemaVerificação.pdf: 7620139 bytes, checksum: 6cf1694753612290ddeead84a3422aba (MD5) / Approved for entry into archive by Ana Rosa Silva (arosa@ufpa.br) on 2015-05-04T11:46:55Z (GMT) No. of bitstreams: 2
license_rdf: 22974 bytes, checksum: 99c771d9f0b9c46790009b9874d49253 (MD5)
Dissertacao_DesenvolvimentoSistemaVerificação.pdf: 7620139 bytes, checksum: 6cf1694753612290ddeead84a3422aba (MD5) / Made available in DSpace on 2015-05-04T11:46:55Z (GMT). No. of bitstreams: 2
license_rdf: 22974 bytes, checksum: 99c771d9f0b9c46790009b9874d49253 (MD5)
Dissertacao_DesenvolvimentoSistemaVerificação.pdf: 7620139 bytes, checksum: 6cf1694753612290ddeead84a3422aba (MD5)
Previous issue date: 2013 / Este trabalho apresenta o desenvolvimento e a aplicação em campo de um sistema para verificação metrológica de transformadores de corrente em alta tensão. O sistema foi desenvolvido utilizando como premissas básicas a portabilidade e a confiabilidade metrológica, de tal forma que pudesse ser facilmente transportado e instalado, sem interrupção do fornecimento de energia elétrica nem o uso de infraestrutura complexa de transporte e montagem. O sistema utiliza como padrão de referência um transdutor ótico, cujo sensor mede a corrente elétrica do primário do transformador de corrente a ser verificado através do efeito magneto-ótico de Faraday. Ele também é composto por outros instrumentos padrão que medem a corrente elétrica do secundário do transformador de corrente sob verificação, e realizam a comparação entre esta e o sinal da saída do transdutor ótico padrão. Foram realizados ensaios em laboratório e em campo. Os ensaios em campo foram realizados em duas subestações em Belém/PA, visando avaliar a correta operação do sistema em condições de alta tensão e alta corrente. Os ensaios foram realizados em seis transformadores de corrente conectados em 230 kV, em condições médias de carga, e obtiveram resultados satisfatórios. / This work presents the development and field application of an on site metrological verification system for high voltage current transformers. It was developed aiming at portability aspects besides the metrological requisites, in such a way it can be easily transported and assembled without the need of power interruption as well as the use of complex and expensive transport and assemble logistics. The system uses an optical transducer as reference standard, whose sensor measures the primary current of current transformer under verification based on Faraday effect It is also composed by additional standard instruments that measure the transformer secondary current under verification, and compares it to the optical transducer output. High voltage laboratory tests as well as on site tests were performed. On site tests were perfomed in two power substations in Brazil, in the city of Belém, in order to assure the correct operation under high voltages and high currents conditions. Six 230 kV rated current transformers were verified. The site tests involved six 230 kV current transformers, under medium load system conditions, and achieved satisfatory results.

Identiferoai:union.ndltd.org:IBICT/oai:repositorio.ufpa.br:2011/6603
Date21 August 2013
CreatorsCOSTA, Marcelo Melo da
ContributorsCOSTA, João Crisóstomo Weyl Albuquerque
PublisherUniversidade Federal do Pará, Programa de Pós-Graduação em Engenharia Elétrica, UFPA, Brasil, Instituto de Tecnologia
Source SetsIBICT Brazilian ETDs
LanguagePortuguese
Detected LanguagePortuguese
Typeinfo:eu-repo/semantics/publishedVersion, info:eu-repo/semantics/masterThesis
Sourcereponame:Repositório Institucional da UFPA, instname:Universidade Federal do Pará, instacron:UFPA
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.0032 seconds