This thesis is focused on issues with transmission of reactive power though the distribution line of E.ON area. The goal is to find out where and in what rate are overflows of reactive power and to project the correctional steps to minimize this overflow. In this solution, there were used data of dispatcher measurement, which were processed by created source code in Matlab. The processing was analyzed for final conclusion. There were discovered shortages in overflow of reactive power in transfer between distribution and transmission line and in unsuitably regulated capacity power factor in Planá power plant and wrong automatic regulation of turns in 440/110kV substation Dasný. The action to minimize overflows of reactive power was projected by decompensation reactor placed in T101 and T102 transformers in substation Tábor.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:220684 |
Date | January 2014 |
Creators | Krátký, Michal |
Contributors | Kašpírek,, Martn, Topolánek, David |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0016 seconds