Return to search

Analýza použití kabelových úseků v trase venkovního vedení 400 kV / Analysis of Using Cable Sections in the Route of 400 kV Overhead Line

The thesis deals with the use of cable sections in the overhead transmission route of the 400 kV transmission system in the Czech Republic, with the design of the arrangement of the cable route and with the solution of the crossover of the cable line with other networks of the technical infrastructure or natural obstacles. The thesis shows what the construction of a 400 kV cable line in the overhead transmission route - which has not been implemented in the Czech Republic as of yet - entails in practice. The first, general part deals with the electrical properties of both the cable lines and the combined overhead transmission lines with intermediate cable sections, and this sets out limitations on the maximum possible length of the cable sections. The following chapters provide an analysis of the magnetic field of the cable line, its impact on the surrounding environment and the possibilities of its shielding. On the basis of this knowledge optimization of the designed cable route arrangement is carried out in order to make the route comply with hygiene limits. The next part uses selected locations on a real route of overhead 400 kV transmission line to show what the construction of cable sections inserted into the route of overhead 400 kV line would involve. The design includes a professional estimate of the time and financial demands of the construction.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:374709
Date January 2013
CreatorsBelatka, Martin
ContributorsRusek, Stanislav, Modlitba, Petr, Matoušek, Antonín
PublisherVysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/doctoralThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0018 seconds