Return to search

Development of a framework for preliminary risk analysis in transportation projects

Thesis (M.S.)--Worcester Polytechnic Institute. / Keywords: continuous risk analysis; risk management; transportation infrastructure projects; cost overrun. Includes bibliographical references (p. 90-92).

Identiferoai:union.ndltd.org:OCLC/oai:xtcat.oclc.org:OCLCNo/57622229
Date January 2004
CreatorsGuo, Wei.
Source SetsOCLC
LanguageEnglish
Detected LanguageEnglish
SourceLink to electronic thesis.

Page generated in 0.0018 seconds