This Diploma work is concerned with the design of project documentation for discharging shakeout machine electric installation. This work continues in the Semestral project 2 in which the background of a new machine was made. Then, this work deals with the replacement of a switch room with required devices including the design of a new connecting cables and power streams. In the first part, the work deals with the control part of the device and the design of control and signal cables including the product documentation of the device. In the second part, the work deals with the proposal of building electro installation in which a new lighting and its use is described. The last part focuses on the coordination during the realization of a suggested device. In this part, all problems coming from the particular working procedures including a proposal of possible solutions are described. According to the project documentation and following realization, the documentation of final concept reflecting the real status of the device is described.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:241115 |
Date | January 2016 |
Creators | Bednář, Vojtěch |
Contributors | Blecha, Martin, Pazdera, Ivo |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.002 seconds