Return to search

Vysoké Mýto - napojení na R35 při postupné výstavbě / Vysoké Mýto - connection to motorway R35, phase of construction

The thesis deals with the stages of development of Vysoke Myto road network with an emphasis to design an optional diversion of the traffic from the town itself even before the planned R35 is finished. The designed solution, including road connections to the present and future network, is to be functional, utilizable and economically desireable in all the stages of development.

Identiferoai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:226949
Date January 2014
CreatorsNovák, Martin
ContributorsNetolický, Stanislav, Holcner, Petr
PublisherVysoké učení technické v Brně. Fakulta stavební
Source SetsCzech ETDs
LanguageCzech
Detected LanguageEnglish
Typeinfo:eu-repo/semantics/masterThesis
Rightsinfo:eu-repo/semantics/restrictedAccess

Page generated in 0.0021 seconds