As the main topic this thesis describes the design and evaluation of selected reinforced concrete members of the prefabricated reinforced concrete industrial building with administration at ultimate limit state in accordance with applicable standards. Movable overhead crane with carrying capacity of 50 tons is the main distinction of the industrial hall. Lateral frame whit main structural parts which are roof prestressed girder, load-bearing column supporting the overhead crane and drilled pile transferring loads from the upper construction to the load bearing subsoil, is designed in particular. Furthermore, design of the Gerber beam which forms the slab construction in the administrational part of the building is elaborated. Structural design and evaluation of other structures of the building is not part of this thesis.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:265275 |
Date | January 2017 |
Creators | Sitta, Martin |
Contributors | Šulák, Pavel, Zlámal, Martin |
Publisher | Vysoké učení technické v Brně. Fakulta stavební |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0025 seconds