Return to search

The downtown Seattle transit project : is a tunnel the appropriate alternative?

Thesis (M.C.P.)--Massachusetts Institute of Technology, Dept. of Urban Studies and Planning, 1988. / Includes bibliographical references. / by Elizabeth Lauren Gotterer. / M.C.P.

Identiferoai:union.ndltd.org:MIT/oai:dspace.mit.edu:1721.1/74343
Date January 1988
CreatorsGotterer, Elizabeth Lauren
ContributorsPeter Cook., Massachusetts Institute of Technology. Dept. of Urban Studies and Planning., Massachusetts Institute of Technology. Dept. of Urban Studies and Planning.
PublisherMassachusetts Institute of Technology
Source SetsM.I.T. Theses and Dissertation
LanguageEnglish
Detected LanguageEnglish
TypeThesis
Format[5], 100 leaves, application/pdf
RightsM.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission., http://dspace.mit.edu/handle/1721.1/7582

Page generated in 0.001 seconds