The aim of this work is the reconstruction and development of the distribution network of DS to ensure electricity supply in the required quality to existing customers and new customers connecting to the planned industrial zone Šlapanice. The first part deals with the inclusion of a distribution network in power system, its distribution and composition. Subsequently, the work deals with the description of the management of distribution networks, cable and outdoor leadership and their parameters. It also contains guidelines for the design of high voltage networks. The end of the first part is devoted to calculating the steady operation of the network. In the second part, the proposed project using the PAS DAISY Off-line v 4.00 Bizon. Based on the available evidence is developed steady state operation. We found that lines are overloaded and need to be strengthened with regard to the development of industrial zones and adjusting the network to ensure safe and reliable operation. The conclusion focuses on the economic evaluation of proposed alternatives.
Identifer | oai:union.ndltd.org:nusl.cz/oai:invenio.nusl.cz:219400 |
Date | January 2012 |
Creators | Řehoř, Jiří |
Contributors | Beneš, Jan, Blažek, Vladimír |
Publisher | Vysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií |
Source Sets | Czech ETDs |
Language | Czech |
Detected Language | English |
Type | info:eu-repo/semantics/masterThesis |
Rights | info:eu-repo/semantics/restrictedAccess |
Page generated in 0.0019 seconds